A farm is usually the best place in the UK for a small wind turbine: open land, good exposure and high daytime electricity use. Here is how to go from idea to switch-on.
Enter your postcode and the field you have in mind. WindScore uses three years of hourly wind records for your location, checks turbulence from barns, trees and hedges, and suggests the turbine size and mast height.
Check your bills for yearly kWh. A 10 to 20 kW turbine suits many livestock and arable farms; a 50 kW turbine suits large dairy, poultry or grain-drying operations. See farm wind turbines.
Farm turbines almost always need planning permission, and turbines over 3.68 kW single-phase need a G99 application approved before installation. Rural networks can be weak, so check grid capacity early. GridQuotes can handle the application.
Groundworks and foundation, a cable trench to your supply, mast and turbine erection (tilt-up or crane), then commissioning and MCS certification. On site this usually takes one to two weeks; the whole process typically three to nine months.
Usually yes, if the site is open and windy enough and planning and the grid connection can be agreed. Farms are often the best small-wind sites in the UK.
Typically £39,000 to £71,500 for 10 to 15 kW, around £80,500 to £110,000 for 20 kW and £155,000 to £215,000 for 50 kW, excluding VAT.
Match it to your yearly use: many farms suit 10 to 20 kW, larger dairy, poultry and grain-drying farms 50 kW.
Almost always. The council will look at noise, landscape, ecology and distance to homes and footpaths.